if the inception date of a composite is 1 Feb 2011, we need to present reuturn from 1.2.11 to 31.12.11.
if the termination date of a composite is 1 Feb 2011, we need to present reuturn from 1.1.11 to 1.2.11.
How about if inception date and termination date of a composite are also 1 Feb 2010. Same disclosure treatment as 2011. That is, 1.2.10 to 31.12.10 and 1.1.10 to 1.2.10, am I all right?